



151. Download CAD Master Plan Layout of the Tourist and Entertainment Resort Project
This CAD drawing presents the master plan layout of a large-scale coastal tourist and entertainment resort, designed with a detailed and well-organized zoning plan. The layout includes essential functional areas such as restaurants, event halls, amusement parks, service zones, and beach resorts.
The entire project is strategically located along the coastline, taking full advantage of the natural topography and sea views. The upper area features main buildings such as the Event Hall, Walking House, and restaurants, while the beachfront showcases water recreation zones, swimming pools, and landscaped green spaces.
The contour lines and elevation details demonstrate an intelligent use of the sloping terrain, creating multi-level spaces that blend with nature. Internal roads, parking areas, and auxiliary structures are clearly marked for easy construction reference.
I also recommend downloading other Urban, Landscaping CAD drawings for your project reference.
- File format: .DWG
- Size: 25.2 MB
- Source: DWGshare
- AutoCAD platform 2018 and later versions. For downloading files there is no need to go through the registration process
If you find our work useful, your support would mean a lot and help us grow even better.DONATE
Related posts
87.Autocad drawings of Garden Floor Plan For Free Download
162. Free Download – Cross-Section Drawing of a 27-Storey Hotel Building
Modern Villa 2d AutoCAD File, JPG Free Download
Chapel free AutoCAD drawings
Supermarket project AutoCAD File DWG
60. Download CAD drawings of meeting room layouts and conference room furniture arrangements
164. Detailed Residential Garden Plan – Free CAD Download
Coffee Processing Plant Cuts AutoCAD File DWG
Garage plan AutoCAD File Free Download